General Description of the Project
Construction Activities undertaken
during the Reporting Period
Status of Environmental Licenses and Permits
Monitoring Parameters and Frequency
Monitoring Methodology and QA/QC Procedure
Monitoring Parameters and Frequency
Monitoring Methodology and
QA/QC Procedure
Comparison of EM&A Result with EIA Prediction
Review of Environmental
Monitoring Procedures
Implementation Status of
Environmental Mitigation Measures
Implementation Status of
Event and Action Plans
Summary of Complaint,
Warning, Notification of any Summons and Successful Prosecution
Monitoring Schedule for
Next Month
lIST OF TABLES
Table I............. Major Site Activities in the Reporting Period
Table II........... Exceedance Record for the Project in the Reporting Period
Table III.......... Summary for Key Information in the Reporting Period
Table IV.......... Tentative Site Activities in the Next Three Months
Table 1.2......... Key Project Contacts
Table 1.3......... Major Site Activities in the Reporting Period
Table 1.4......... Summary of Environmental Licenses and Permits under Contract
DC/2024/11
Table 1.5......... Summary of Environmental Licenses and Permits under Contract
DE/2024/09
Table 2.1......... Location of Water Quality Monitoring
Table 2.2......... Water Quality Monitoring Parameters and Frequency
Table 2.3......... Water Quality Monitoring Equipment
Table 2.4......... Types of Sampling Bottles and Preservation Methods
Table 2.5......... Methods for Laboratory Analysis for Water Samples
Table 2.6......... Calculated Action and Limit Levels of Water Quality
Monitoring
Table 2.7......... Number of Exceedances in Water Quality Monitoring in
Reporting Period
Table 2.8......... Major Influencing Factors on Water Quality Monitoring Results
Table 3.1 ........ Locations for Air Quality Monitoring
Table 3.2 ........ Impact Dust Monitoring Parameters, Frequency and Duration
Table 3.3 ........ Air Quality Monitoring Equipment
Table 3.4......... Major Influencing Factors on Air Quality Monitoring Results
Table 3.5......... Comparison of 1-hr TSP Monitoring Data with Predictions in
EIA Report
Table 4.1......... Quantities of Waste Generated from Contract DC/2024/11
Table 4.2......... Quantities of Waste Generated from Contract DE/2024/09
Table 6.1......... Observations and Recommendations of Site Audit under Contract
DC/2024/11
Table 6.2......... Observations and Recommendations of Site Audit under Contract
DE/2024/09
Table 7.1......... Tentative Site Activities in the Next Three Months
lIST OF FIGUREs
Figure 1.2 Project Organisation for Environmental Monitoring and
Audit
Figure 2.1 Location
of Water Quality Monitoring Station
Figure 3.1 Location
of Air Quality Monitoring Station
lIST OF APPENDIces
Appendix
A Action and Limit Levels
Appendix
B Copies of Calibration
Certificates
Appendix
C Environmental Monitoring Schedules
Appendix
E Water
Monitoring Results and Graphical Presentations
Appendix
F Laboratory
Testing Reports with Quality Control Reports for Water Monitoring
Appendix
G Air
Monitoring Results and Graphical Presentations
Appendix
H Summary of Exceedance
Appendix
I Environmental Mitigation
Implementation Schedule (EMIS)
Appendix
J Event and Action Plan
Appendix
L Summary of Waste Generation and
Disposal Records
Appendix M Construction Programme
Introduction
1. This is the 20th Monthly Environmental Monitoring and Audit (EM&A) Report prepared by the Environmental Team (ET), Cinotech Consultants Ltd., for Contract No. HATS 01/2025 “Environment Team for Hung Shui Kiu Effluent Polishing Plant – Phase 1” (hereinafter called “the Project”. This report documents the findings of the EM&A programme under the issued EP No. EP-608/2022/A, and in accordance with the requirements specified in the EM&A Manual during the reporting period from 1 April 2026 to 30 April 2026.
2.
The major site activities undertaken in the reporting period are shown in Table I.
|
Contract No. |
Contract
Title |
Site
Activities |
|
DC/2024/11 |
Hung
Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – Civil Works |
l Temporary Drainage Construction
l Erection of the site office
l
Driven H-piling
|
|
DE/2024/09 |
Hung
Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – E&M Works and
Biological Treatment Building |
l
Erection
of the site office
|
Environmental
Monitoring Works and Audit
3. Environmental monitoring for the Project had been performed in accordance with the EM&A Manual, and the monitoring results were checked and reviewed. Site Inspections/Audits shall be conducted once per week. The weekly site inspection was conducted on 2, 10, 17, 24 and 30 April 2026 in the reporting month. IEC joint site inspection was conducted on 10 April 2026. The implementation of the environmental mitigation measures, Event Action Plans and environmental complaint handling procedures, including the items responsible by the ET, was also checked.
4.
The
summary of exceedances in the reporting period for
the Project is tabulated in Table II.
|
Item |
Parameters |
No. of Exceedance |
No. of Exceedances due to
site activities of the Project |
||
|
Action Level |
Limit Level |
Action Level |
Limit Level |
||
|
Water Quality |
DO, mg/L |
1 |
4 |
0 |
0 |
|
Turbidity, NTU |
0 |
3 |
0 |
0 |
|
|
SS, mg/L |
0 |
1 |
0 |
0 |
|
|
Air Quality |
1-hour TSP, μg/m3 |
0 |
0 |
0 |
0 |
Water Quality Monitoring
5.
The WQ impact monitoring on the last week has been rescheduled from 27
& 29 April to 28 & 30 April. Another water quality monitoring was
conducted as scheduled in the reporting period. One (1) Action Level and eight
(8) Limit Level exceedances were recorded. All exceedances are considered as non-project related. Details are provided in Appendix
E.
Air Quality Monitoring
6.
The air quality monitoring was conducted as scheduled in the reporting period. No Action
Level and Limit Level exceedances were recorded.
Details are provided in Appendix G.
Key
Information in the
Reporting Period
7.
Complaints, notifications of
any summonses and prosecutions, as well as public engagement activities during
the reporting period, are summarised in Table III.
|
Event |
Details |
Action Taken |
Status |
Remark |
|
|
Number |
Nature |
||||
|
Complaint
Received |
0 |
- |
N/A |
N/A |
- |
|
Notifications
of any summons & prosecutions received |
0 |
- |
N/A |
N/A |
- |
|
Public
Engagement Activities |
0 |
- |
N/A |
N/A |
- |
Reporting Change
8.
There were no reporting changes during the reporting period.
Future Key Issue
9.
The key site activities will be anticipated in the coming
three months are shown in Table IV.
|
Contract No. |
Contract
Title |
Site
Activities |
|
DC/2024/11 |
Hung
Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – Civil Works |
l Temporary Drainage Construction
l Mobilisation work
l Erection of the site office
l Driven H-piling
l
Sheet
piling
|
|
DE/2024/09 |
Hung
Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – E&M Works and
Biological Treatment Building |
l
Erection of the site office
l
Ground investigation works at BTB for stage 2 of early access
|
10.
The future key environmental issues in the next
three months include:
|
Contract No. of the Environment Team for
HSKEPP |
Environment Team |
Submission of the previous monthly EM&A
report |
|
HATS 07/2023 |
WSP (Asia) Limited (WSP) |
Sep 2024 to Jan
2026 |
|
HATS
01/2025 |
Cinotech Consultants Ltd. |
Feb 2026 to Mar 2026 |
|
Party |
Role |
Contact Person |
Position |
Phone No. |
|
DSD |
Project Proponent |
Mr. Gabriel Lau |
Engr/6 (Harbour Area Treatment Scheme) |
3965 8629 |
|
AECOM |
Project Manager or Project Manager’s
Delegates |
Mr. Brian Wong |
Associate |
3856 5082 |
|
Cinotech |
Environmental Team (ET) |
Ms. Betty Choi |
ET Leader |
2151 2072 |
|
AtkinsRéalis |
Independent Environmental Checker (IEC) |
Mr. W. K. Chiu |
Independent Environmental Checker |
2972 1322 |
|
CSBBJV |
Contractor (DC/2024/11) |
Ms. Tiffany Tsang |
Environmental Officer |
5117 9020 |
|
REC-CEL JV |
Contractor (DE/2024/09) |
Mr. Stephen Tsang |
Environmental Officer |
9686 0787 |
|
Contract No. |
Contract Title |
Major Site Activities |
|
DC/2024/11 |
Hung Shui Kiu Effluent Polishing Plant
(HSKEPP) Phase 1 – Civil Works |
l
Temporary
Drainage Construction
l
Erection
of the site office
l Driven H-piling
|
|
DE/2024/09 |
Hung Shui Kiu Effluent Polishing Plant
(HSKEPP) Phase 1 – E&M Works and Biological Treatment Building |
l Erection of the site office
|
|
Permit / License No. |
Valid Period |
Status |
|
|
From |
To |
||
|
Environmental
Permit (EP) |
|||
|
EP-608/2022/A |
23 Apr 2025 |
N/A |
Valid |
|
Notification
pursuant to Air Pollution Control (Construction Dust) Regulation |
|||
|
10018879 |
30 Jun 2025 |
End of Project |
Valid |
|
Billing
Account for Construction Waste Disposal |
|||
|
7055204 |
22 Jul 2025 |
N/A |
Valid |
|
Registration of
Chemical Waste Producer |
|||
|
WPN-5213-511-C5120-01 |
13 Oct 2025 |
N/A |
Valid |
|
Wastewater
Discharge License |
|||
|
WT000480221-2026 (Western Plant) |
22 Jan 2026 |
31 Jan 2031 |
Valid |
|
Construction
Noise Permit |
|||
|
PP-RN0003-26 (Percussive Piling) |
4 Feb 2026 |
3 May 2026 |
Valid |
|
GW- RN0121-26 |
2 Feb 2026 |
1 May 2026 |
Valid |
|
Permit / License No. |
Valid Period |
Status |
|
|
From |
To |
||
|
Environmental
Permit (EP) |
|||
|
EP-608/2022/A |
23 Apr 2025 |
N/A |
Valid |
|
Notification
pursuant to Air Pollution Control (Construction Dust) Regulation |
|||
|
N/A |
N/A |
N/A |
Apply when
necessary |
|
Billing Account
for Construction Waste Disposal |
|||
|
7055160 |
14 Jul 2025 |
N/A |
Valid |
|
Registration
of Chemical Waste Producer |
|||
|
N/A |
N/A |
N/A |
Apply when
necessary |
|
Wastewater
Discharge License |
|||
|
N/A |
N/A |
N/A |
Apply when
necessary |
|
Construction Noise
Permit |
|||
|
N/A |
N/A |
N/A |
Apply when
necessary |
|
Stations |
Locations |
Coordinates (HK1980) |
|
|
Easting
(m) |
Northing
(m) |
||
|
C1 |
Control Station at the upstream location
of the construction site |
816278 |
834038 |
|
M1 |
Impact station at the downstream location
of the construction site |
816571 |
833970 |
|
Stations |
Parameters
(unit) |
Depth |
Frequency |
|
C1 M1 |
In-situ:
l Temperature(°C)
l pH (pH units)
l Turbidity (NTU)
l Water depth (cm)
l Salinity (ppt)
l Dissolved oxygen (DO) (mg/L and % of
saturation)
Laboratory
Testing: l Suspended solids (SS) (mg/L)
|
Mid-depth at the River/Stream |
3 days per week |
|
Equipment |
Model |
Serial No. |
Qty. |
|
Multi-parameter Water Quality System |
YSI
EXO 1
|
16J100880 (for Sonde) 17A105025 (for DO Sensor) 17A105120(for Temperature Sensor) 16J101124 (for Turbidity Sensor) 17B100258(for pH Sensor) |
1 |
|
Parameters to be Tested |
Preservation |
Type of Sample Container |
|
Total Suspended Solids (SS) |
Refrigerate
|
1-litre high-density polythene bottle |
|
Parameters |
Proposed
Method |
Detection Limit |
|
Suspended Solids (SS) |
APHA
2540D (1)
|
1.0 mg/L(2) |
Note:
(1) APHA American Public Health Association Standard
Methods for the Examination of Water and Wastewater.
(2) If the lab result of SS concentration at
the control station was less than 1.0 mg/L, 1.0 mg/L would be assumed as the SS
concentration for calculating the action and limit levels based on the control
station as a conservative approach.
|
Parameters |
Unit |
Action
Level |
Limit
Level |
|
DO (1) |
mg/L |
≤ 3.8 (3)(4) |
≤ 3.7 (3)(4) |
|
Turbidity (2) |
NTU |
≥ 17.2 (3) or 120% of the upstream control station(s)
at the same tide of the same day, whichever is higher |
≥ 17.7 (3) or 130% of the upstream control station(s)
at the same tide of the same day, whichever is higher |
|
SS (2) |
mg/L |
≥ 25.0 (3) or 120% of the upstream control station(s)
at the same tide of the same day, whichever is higher |
≥ 26.0 (3) or 130% of the upstream control station(s)
at the same tide of the same day, whichever is higher |
(1) For
DO, non-compliance with the water quality limits occurs when the monitoring
result is lower than the limits.
(2) For turbidity & SS, non-compliance with the
water quality limits occurs when the monitoring result is higher than the
limits.
(3) Average concentrations with duplicates
have been adopted in the calculation.
(4) The calculated action/limit levels of DO are the same after correcting
to the nearest 0.1mg/L.
|
Parameters |
No. of Exceedance |
No. of Exceedances due to site activities of the Project |
||
|
Action Level |
Limit Level |
Action Level |
Limit Level |
|
|
DO, mg/L |
1 |
4 |
0 |
0 |
|
Turbidity, NTU |
0 |
3 |
0 |
0 |
|
SS, mg/L |
0 |
1 |
0 |
0 |
|
Total |
1 |
8 |
0 |
0 |
|
Monitoring Stations |
Influencing Factors on Water Quality Monitoring |
|
C1 - Control
Station |
l General refuse
accumulation surrounding the stream
l Suspected abnormal discharges surrounding the CEDD construction site
l Upstream
muddy water from the sub-channel due to
heavy rainfall weather
|
|
M1 - Impact
Station |
|
Monitoring
Stations |
Locations |
Location of Measurement |
|
AM1 |
Tseung Kong Wai |
Ground Level |
|
AM2 |
Farm House |
Ground Level |
|
AM3 (1) |
Planned Port Back-up, Storage and
Workshop |
N/A |
(1) Air quality
impact monitoring station AM3 has been suspended since Nov 2024.
|
Monitoring Stations |
Parameter |
Period |
Frequency |
|
AM1,
AM2 & AM3(1) |
1-hour TSP |
0700 – 1900 |
Three times / six days |
Note:
(1)
Air quality impact monitoring station AM3 has been suspended since Nov 2024.
|
Equipment |
Model and Make |
Serial No. |
Quantity |
|
1-hour TSP Dust Meter |
Sibata Model No.: LD-5R |
4X7585 4X7586 |
2 |
|
HVS for Calibration/Maintenance |
GMW GS2310 |
10379 |
1 |
|
Calibrator |
TISCH Model: TE-5025A |
3864 |
1 |
|
Monitoring Stations |
Influencing Factors on Air Quality Monitoring |
|
AM1 - Tseung Kong Wai |
l Road
Traffic at Ha Tsuen Road & the surrounding vintage road
l Non-project
related construction activities and storage of dusty material from the CEDD
project site managed by Gammon – Richwell
Engineering Joint Venture
|
|
AM2 - Farm House |
l Road
Traffic at Ha Tsuen Road & the surrounding vintage road
l Non-project
related construction activities from the CEDD project site managed by Sang Hing – Kuly Joint
Venture
& Gammon – Richwell
Engineering Joint Venture
|
|
AM3 - Planned Port Back-up, Storage and
Workshop (1) |
l N/A
|
Note:
(1) Air quality impact monitoring station AM3 has
been suspended since Nov 2024.
|
Monitoring
Stations |
ASR ID |
Predicted Maximum 1-hr TSP Concentration
in EIA Report (AEIAR-240/2022), μg/m3 |
Reporting Month Result, μg/m3 |
|
AM1
- Tseung Kong Wai |
A601 |
154.0 |
23.4 – 97.2 |
|
AM2
- Farm House |
A602 |
215.1 |
8.0 – 88.0 |
|
AM3
- Planned Port Back-up, Storage and Workshop (1) |
P1501 |
234.6 |
N/A |
Note:
(1)
Air quality impact monitoring station AM3 has been suspended since Nov 2024.
|
Contract DC/2024/11 |
Quantity |
||||||
|
Inert C&D Materials |
Non-inert C&D Materials |
||||||
|
Reporting
Period |
Total
Quantity Generated (in
'000kg) |
Disposed
as Public
Fill (in '000kg) |
Others,
e.g. general
refuse (in '000kg) |
Metals (in
'000kg) |
Paper/cardboard Packaging (in
'000kg) |
Plastics (in
'000kg) |
Chemical
waste (in '000kg) |
|
Apr 2026 |
14.39 |
14.39 |
13.78 |
0 |
0 |
0 |
0 |
|
Contract DE/2024/09 |
Quantity |
||||||
|
Inert C&D Materials |
Non-inert C&D Materials |
||||||
|
Reporting
Period |
Total
Quantity Generated (in
'000kg) |
Disposed
as Public
Fill (in '000kg) |
Others,
e.g. general
refuse (in '000kg) |
Metals (in
'000kg) |
Paper/cardboard Packaging (in
'000kg) |
Plastics (in
'000kg) |
Chemical
waste (in '000kg) |
|
Apr 2026 |
0 |
0 |
3.190 |
0 |
0 |
0 |
0 |
|
Parameters |
Date |
Observations |
Follow-up
Actions |
|
Water Quality |
24 Apr 2026 |
Vehicle
wheel washing should be provided to prevent mud from flowing out of the
site at the Eastern site. |
A
dedicated vehicle wheel washing station has been installed at the site exit.
The facility includes water spray nozzles, drainage channels, and bunding to
contain and manage runoff water effectively. Temporary bunds have been
constructed around the washing area to prevent contaminated water from
flowing off-f-site. |
|
Air Quality |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Noise |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Waste / Chemical
Management |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Land
Contamination |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Landscape and Visual |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Permits /Licences |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Parameters |
Date |
Observations |
Follow-up
Actions |
|
Water Quality |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Air Quality |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Noise |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Waste / Chemical
Management |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Land
Contamination |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Landscape and Visual |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Permits /Licences |
N/A |
No environmental
deficiency was identified in the reporting period. |
N/A |
|
Contract No. |
Contract
Title |
Site
Activities |
|
DC/2024/11 |
Hung
Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – Civil Works |
l Temporary Drainage Construction
l
Mobilisation
work
l
Erection
of the site office
l
Driven H-piling
l Sheet piling
|
|
DE/2024/09 |
Hung
Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – E&M Works and
Biological Treatment Building |
l Erection
of the site office
l Ground investigation works at
BTB for stage 2 of early access
|