TABLE OF CONTENTS

EXECUTIVE SUMMARY.. 1

1     INTRODUCTION.. 3

Background. 3

General Description of the Project 4

Purpose of the Report 4

Summary of EM&A Requirements. 4

Project Organisations. 4

Construction Activities undertaken during the Reporting Period. 5

Status of Environmental Licenses and Permits. 6

2     Water Quality.. 7

Monitoring Requirements. 7

Monitoring Locations. 7

Monitoring Parameters and Frequency. 7

Monitoring Equipment 8

Monitoring Methodology and QA/QC Procedure. 9

Results and Observations. 11

3     AIR Quality.. 13

Monitoring Requirements. 13

Monitoring Locations. 13

Monitoring Parameters and Frequency. 13

Monitoring Equipment 13

Monitoring Methodology and QA/QC Procedure. 14

Results and Observations. 15

Comparison of EM&A Result with EIA Prediction. 16

4     Waste Management.. 17

Monitoring Requirements. 17

Results and Observations. 17

5     landscape and visual.. 18

Monitoring Requirements. 18

Results and Observations. 18

6     Environmental Audit.. 19

Site Audits. 19

Review of Environmental Monitoring Procedures. 19

Implementation Status of Environmental Mitigation Measures. 19

Implementation Status of Event and Action Plans. 21

Summary of Complaint, Warning, Notification of any Summons and Successful Prosecution. 21

7     future Key issues. 22

Recommendations. 22

Monitoring Schedule for Next Month. 22

8     Conclusions. 23

 

lIST OF TABLES

Table I............. Major Site Activities in the Reporting Period

Table II........... Exceedance Record for the Project in the Reporting Period

Table III.......... Summary for Key Information in the Reporting Period

Table IV.......... Tentative Site Activities in the Next Three Months

Table 1.1......... Summary for the inter-relationship between various contracts of the HSKEPP project and submission of previous EM&A reports

Table 1.2......... Key Project Contacts

Table 1.3......... Major Site Activities in the Reporting Period

Table 1.4......... Summary of Environmental Licenses and Permits under Contract DC/2024/11

Table 1.5......... Summary of Environmental Licenses and Permits under Contract DE/2024/09

Table 2.1......... Location of Water Quality Monitoring

Table 2.2......... Water Quality Monitoring Parameters and Frequency

Table 2.3......... Water Quality Monitoring Equipment

Table 2.4......... Types of Sampling Bottles and Preservation Methods

Table 2.5......... Methods for Laboratory Analysis for Water Samples

Table 2.6......... Calculated Action and Limit Levels of Water Quality Monitoring

Table 2.7......... Number of Exceedances in Water Quality Monitoring in Reporting Period

Table 2.8......... Major Influencing Factors on Water Quality Monitoring Results

Table 3.1 ........ Locations for Air Quality Monitoring

Table 3.2 ........ Impact Dust Monitoring Parameters, Frequency and Duration

Table 3.3 ........ Air Quality Monitoring Equipment

Table 3.4......... Major Influencing Factors on Air Quality Monitoring Results

Table 3.5......... Comparison of 1-hr TSP Monitoring Data with Predictions in EIA Report

Table 4.1......... Quantities of Waste Generated from Contract DC/2024/11

Table 4.2......... Quantities of Waste Generated from Contract DE/2024/09

Table 6.1......... Observations and Recommendations of Site Audit under Contract DC/2024/11

Table 6.2......... Observations and Recommendations of Site Audit under Contract DE/2024/09

Table 7.1......... Tentative Site Activities in the Next Three Months

 

lIST OF FIGUREs

Figure 1.1             Site Layout Plan

Figure 1.2             Project Organisation for Environmental Monitoring and Audit

Figure 2.1             Location of Water Quality Monitoring Station

Figure 3.1             Location of Air Quality Monitoring Station

 

lIST OF APPENDIces

Appendix A          Action and Limit Levels

Appendix B          Copies of Calibration Certificates

Appendix C          Environmental Monitoring Schedules

Appendix D          Weather Conditions

Appendix E          Water Monitoring Results and Graphical Presentations

Appendix F          Laboratory Testing Reports with Quality Control Reports for Water Monitoring

Appendix G          Air Monitoring Results and Graphical Presentations

Appendix H          Summary of Exceedance

Appendix I           Environmental Mitigation Implementation Schedule (EMIS)

Appendix J           Event and Action Plan

Appendix K          Summaries of Environmental Complaint, Warning, Summon and Notification of Successful Prosecution

Appendix L          Summary of Waste Generation and Disposal Records

Appendix M         Construction Programme   


EXECUTIVE SUMMARY

Introduction

1.            This is the 20th Monthly Environmental Monitoring and Audit (EM&A) Report prepared by the Environmental Team (ET), Cinotech Consultants Ltd., for Contract No. HATS 01/2025 Environment Team for Hung Shui Kiu Effluent Polishing Plant – Phase 1” (hereinafter called “the Project”. This report documents the findings of the EM&A programme under the issued EP No. EP-608/2022/A, and in accordance with the requirements specified in the EM&A Manual during the reporting period from 1 April 2026 to 30 April 2026.

 

2.            The major site activities undertaken in the reporting period are shown in Table I.

Table I             Major Site Activities in the Reporting Period

Contract No.

Contract Title

Site Activities

DC/2024/11

Hung Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – Civil Works

l  Temporary Drainage Construction
l  Erection of the site office
l  Driven H-piling

DE/2024/09

Hung Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – E&M Works and Biological Treatment Building

l  Erection of the site office

 

Environmental Monitoring Works and Audit

3.            Environmental monitoring for the Project had been performed in accordance with the EM&A Manual, and the monitoring results were checked and reviewed. Site Inspections/Audits shall be conducted once per week. The weekly site inspection was conducted on 2, 10, 17, 24 and 30 April 2026 in the reporting month. IEC joint site inspection was conducted on 10 April 2026.  The implementation of the environmental mitigation measures, Event Action Plans and environmental complaint handling procedures, including the items responsible by the ET, was also checked.

 

4.            The summary of exceedances in the reporting period for the Project is tabulated in Table II.

Table II           Exceedance Record for the Project in the Reporting Period

Item

Parameters

No. of Exceedance

No. of Exceedances due to site activities of the Project

Action Level

Limit Level

Action Level

Limit Level

Water Quality

DO, mg/L

1

4

0

0

Turbidity, NTU

0

3

0

0

SS, mg/L

0

1

0

0

Air Quality

1-hour TSP, μg/m3

0

0

0

0

 

Water Quality Monitoring

5.            The WQ impact monitoring on the last week has been rescheduled from 27 & 29 April to 28 & 30 April. Another water quality monitoring was conducted as scheduled in the reporting period. One (1) Action Level and eight (8) Limit Level exceedances were recorded. All exceedances are considered as non-project related. Details are provided in Appendix E.

 

Air Quality Monitoring

6.            The air quality monitoring was conducted as scheduled in the reporting period. No Action Level and Limit Level exceedances were recorded. Details are provided in Appendix G.

 

Key Information in the Reporting Period

7.            Complaints, notifications of any summonses and prosecutions, as well as public engagement activities during the reporting period, are summarised in Table III.

Table III          Summary for Key Information in the Reporting Period

Event

Details

Action Taken

Status

Remark

Number

Nature

Complaint Received

0

-

N/A

N/A

-

Notifications of any summons & prosecutions received

0

-

N/A

N/A

-

Public Engagement Activities

0

-

N/A

N/A

-

 

Reporting Change

8.            There were no reporting changes during the reporting period.

 

Future Key Issue

9.            The key site activities will be anticipated in the coming three months are shown in Table IV.

Table IV          Tentative Site Activities in the Next Three Months

Contract No.

Contract Title

Site Activities

DC/2024/11

Hung Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – Civil Works

l  Temporary Drainage Construction
l  Mobilisation work
l  Erection of the site office
l  Driven H-piling
l  Sheet piling

DE/2024/09

Hung Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – E&M Works and Biological Treatment Building

l   Erection of the site office
l   Ground investigation works at BTB for stage 2 of early access

 

 

10.        The future key environmental issues in the next three months include:

l   Wastewater and run-off generation on-site;
l   Water spraying for dust-generating activities and on haul road;
l   Accumulation of general refuse and construction waste on-site;
l   Accumulation of a stockpile of soil & weeds from haul road cleaning activities or slope maintenance.

 

0               INTRODUCTION

Background

1.1         The Hung Shui Kiu Effluent Polishing Plant (HSKEPP) (the Project), which is located in the north-western side of the Hung Shui Kiu / Ha Tsuen New Development Area (HSK/HT NDA). It is designed to provide reliable, adequate and quality sewage treatment and sewage effluent disposal for the sewage collected from the new developments within the HSK/HT NDA and other developments on the North West New Territories (NWNT).

1.2         An Environmental Impact Assessment (EIA) study for the Project was conducted in accordance with EIA Study Brief No. ESB- 312/2019. The EIA Report and Environmental Monitoring and Audit (EM&A) Manual (Register No. AEIAR – 240/2022) were approved on 19 Oct 2022 under the Environmental Impact Assessment Ordinance (EIAO), with an Environmental Permit (EP) granted on 19 Oct 2022 (EP-608/2022). Variation of Environmental Permit (EP-608/2022A) was issued by the Environmental Protection Department (EPD) on 23 Apr 2025.

1.3         According to the approved EM&A Manual of HSKEPP, the EM&A monitoring for the Project includes air quality monitoring and water quality monitoring. Baseline dust and water quality monitoring for HSKEPP was conducted between 24 Jun 2024 and 20 Jul 2024.

1.4         The Contract No. HATS 07/2023 was superseded by Contract No. HATS 01/2025 from Feb 2026. EM&A Works for HSKEPP shall continue and be reported under the new Contract. Cinotech Consultants Limited (Cinotech) was commissioned by the Drainage Services Department (DSD) as the Environmental Team (ET) to undertake environmental monitoring and auditing services for the Project to ensure that the environmental performance of the Works Contract complies with the requirements specified in the EP, EM&A Proposal, Service Specifications and Supporting Documents of the Project and other relevant statutory requirements.

1.5         The commencement date of the construction works of HSKEPP (EP-608/2022 & EP-608/2022/A) was on 6 Sep 2024. A total of 2 Environmental Team contracts for HSKEPP have been conducted to undertake the EM&A works from the commencement of the Project. The inter-relationship between various contracts of the HSKEPP project and submission of previous EM&A reports is shown in Table 1.1

Table 1.1    Summary for the inter-relationship between various contracts of the HSKEPP project and submission of previous EM&A reports        

Contract No. of the Environment Team for HSKEPP

Environment Team

Submission of the previous monthly EM&A report

HATS 07/2023

WSP (Asia) Limited (WSP)

Sep 2024 to Jan 2026

HATS 01/2025

Cinotech Consultants Ltd.

 Feb 2026 to Mar 2026


 

General Description of the Project

1.6         The key elements of this Project are listed below:

l   Demolition of existing structures and buildings within San Wai Preliminary Treatment Works (SWPTW) for the construction of HSKEPP facilities;
l   Construction of a sewage treatment plant with a maximum capacity of Average Dry Weather Flow (ADWF) up to 90,000 m3/day;
l   Construction of sludge treatment facilities for treating sludge generated from Hung Shui Kiu (HSK) Effluent Polishing Plant (EPP) and additional sludge generated from the San Wai Sewage Treatment Works (STW) and other nearby STWs;
l   Construction of facilities for receiving and co-digesting pre-treated food or organic wastes;
l   Construction of effluent discharge pipe connecting to the existing discharge tunnel of San Wai STW; and
l   Associated ancillary works.

1.7         The layout plan of the Project is shown in Figure 1.1.

Purpose of the Report

1.8         This is the 20th Monthly EM&A Report prepared by the Environmental Team, Cinotech Consultants Ltd., for Contract No. HATS 01/2025 “Hung Shui Kiu Effluent Polishing Plant – Phase 1”, which summarises the impact monitoring results and audit findings in accordance with the requirement specified in the EM&A Manual (AEIAR-240/2022) for HSKEPP approved on 19 October 2022 during the reporting period from 1 April 2026 to 30 April 2026.

Summary of EM&A Requirements

1.9         The EM&A programme specified in the EM&A Proposal requires water quality monitoring, air quality monitoring, environmental site audit, etc. The EM&A requirements for each parameter are described in the following sections, including:

l   All monitoring parameters;
l   Action and Limit levels for all environmental parameters;
l   Event and Action Plans;
l   Environmental mitigation measures, as recommended in the EIA Reports, Environmental Review Reports and the EM&A Proposal.

1.10     The advice on the implementation status of environmental protection and pollution control/mitigation measures is summarised in Section 6 of this report.

1.11     This report presents the monitoring results, observations, locations, equipment, period, methodology and QA/QC procedures of the required water quality monitoring, air quality monitoring and audit works for the Project in the reporting period.

Project Organisations

1.12     Different Parties with different levels of involvement in the project organisation include:

l   Permit Holder Drainage Services Department (DSD)
l   Project Manager or Project Manager’s Delegates AECOM (Asia) Consultants Limited (AECOM)
l   Environmental Team (ET) Cinotech Consultants Limited (Cinotech)
l   Independent Environmental Checker (IEC) AtkinsRéalis Asia Limited (AtkinsRéalis)
l   Contractor (DC/2024/11) China State - Best Build Joint Venture (CSBBJV)
l   Contractor (DE/2024/09) REC Engineering - Chevalier (Envirotech) Limited Joint Venture (REC-CEL JV)

1.13     The key contacts of the Project are listed in Table 1.2.

Table 1.2    Key Project Contacts

Party

Role

Contact Person

Position

Phone No.

DSD

Project Proponent

Mr. Gabriel Lau

Engr/6 (Harbour Area Treatment Scheme)

3965 8629

AECOM

Project Manager or Project Manager’s Delegates

Mr. Brian Wong

Associate

3856 5082

Cinotech

Environmental Team (ET)

Ms. Betty Choi

ET Leader

2151 2072

AtkinsRéalis

Independent Environmental Checker (IEC)

Mr. W. K. Chiu

Independent Environmental Checker

2972 1322

CSBBJV

Contractor (DC/2024/11)

Ms. Tiffany Tsang

Environmental Officer

5117 9020

REC-CEL JV

Contractor (DE/2024/09)

Mr. Stephen Tsang

Environmental Officer

9686 0787

 

1.14     The Organisational Structure for Environmental Management is shown in Figure 1.2.

Construction Activities undertaken during the Reporting Period

1.15     The construction programme is presented in Appendix M.

1.16     The major site activities undertaken in the reporting period are shown in Table 1.3.

Table 1.3    Major Site Activities in the Reporting Period

Contract No.

Contract Title

Major Site Activities

DC/2024/11

Hung Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – Civil Works

l  Temporary Drainage Construction
l  Erection of the site office
l  Driven H-piling

DE/2024/09

Hung Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – E&M Works and Biological Treatment Building

l  Erection of the site office

 

Status of Environmental Licenses and Permits

1.17     All relevant permits/licences obtained for this Project under Contract DC/2024/11 and DE/2024/09 are summarised in Table 1.4 and Table 1.5, respectively.

Table 1.4    Summary of Environmental Licenses and Permits under Contract DC/2024/11

Permit / License No.

Valid Period

Status

From

To

Environmental Permit (EP)

EP-608/2022/A

23 Apr 2025

N/A

Valid

Notification pursuant to Air Pollution Control (Construction Dust) Regulation

10018879

30 Jun 2025

End of Project

Valid

Billing Account for Construction Waste Disposal

7055204

22 Jul 2025

N/A

Valid

Registration of Chemical Waste Producer

WPN-5213-511-C5120-01

13 Oct 2025

N/A

Valid

Wastewater Discharge License

WT000480221-2026

(Western Plant)

22 Jan 2026

31 Jan 2031

Valid

Construction Noise Permit

PP-RN0003-26

(Percussive Piling)

4 Feb 2026

3 May 2026

Valid

GW- RN0121-26

2 Feb 2026

1 May 2026

Valid

 

Table 1.5    Summary of Environmental Licenses and Permits under Contract DE/2024/09

Permit / License No.

Valid Period

Status

From

To

Environmental Permit (EP)

EP-608/2022/A

23 Apr 2025

N/A

Valid

Notification pursuant to Air Pollution Control (Construction Dust) Regulation

N/A

N/A

N/A

Apply when necessary

Billing Account for Construction Waste Disposal

7055160

14 Jul 2025

N/A

Valid

Registration of Chemical Waste Producer

N/A

N/A

N/A

Apply when necessary

Wastewater Discharge License

N/A

N/A

N/A

Apply when necessary

Construction Noise Permit

N/A

N/A

N/A

Apply when necessary


 

1               Water Quality

Monitoring Requirements

2.1         In accordance with the EM&A Manual, impact water quality monitoring shall be carried out during the construction phase. The impact of water quality monitoring should be taken at all designated monitoring stations 3 days per week. The intervals between two sampling surveys should not be less than 36 hours. Appendix A shows the established Action/Limit Levels for the environmental monitoring works.

2.2         Duplicate in-situ measurements (Dissolved Oxygen (DO) concentration, turbidity and pH) and water samples (Suspended Solids (SS) at specific depth were monitored in accordance with the requirements in the EM&A Proposal.

2.3         Other relevant data were also recorded, such as monitoring location/position, time, sampling depth, weather conditions and any special phenomena or work underway nearby.

Monitoring Locations

2.4         According to the Contract Specification, water quality monitoring is required to be conducted at two monitoring stations (one upstream control station and one downstream impact station). The monitoring stations are summarised in Table 2.1 and shown in Figure 2.1.

Table 2.1    Location of Water Quality Monitoring

Stations

Locations

Coordinates (HK1980)

Easting (m)

Northing (m)

C1

Control Station at the upstream location of the construction site

816278

834038

M1

Impact station at the downstream location of the construction site

816571

833970

 

Monitoring Parameters and Frequency

2.5         Table 2.2 summarises the monitoring parameters of the impact of water quality monitoring.

Table 2.2    Water Quality Monitoring Parameters and Frequency

Stations

Parameters (unit)

Depth

Frequency

C1

M1

In-situ:

l Temperature(°C)
l pH (pH units)
l Turbidity (NTU)
l Water depth (cm)
l Salinity (ppt)
l Dissolved oxygen (DO) (mg/L and % of saturation)

 

Laboratory Testing:

l Suspended solids (SS) (mg/L)

Mid-depth at the River/Stream

3 days per week

 

2.6         Monitoring location/position, time, water depth, sampling depth, weather conditions and any special phenomena or work underway nearby were also recorded.

Monitoring Equipment

2.7         The equipment used in the water quality monitoring programme is listed in Table 2.3. The copies of the calibration certificates of the multi-parameter water quality system are shown in Appendix B. The adopted equipment fulfils the requirements specified in the EM&A Programme as detailed in the following paragraphs.

Table 2.3    Water Quality Monitoring Equipment

Equipment

Model

Serial No.

Qty.

Multi-parameter Water Quality System

YSI EXO 1

16J100880 (for Sonde)

17A105025 (for DO Sensor)

17A105120(for Temperature Sensor)

16J101124 (for Turbidity Sensor)

17B100258(for pH Sensor)

1

 

Dissolved Oxygen (DO) and Temperature

2.8         A portable and weatherproof instrument for measuring dissolved oxygen and temperature with a cable, sensor, and DC power source was adopted. The equipment is capable of measuring:

l   DO level in the range of 0-20 mg/L and 0-200% saturation; and
l   temperature in the range of 0-45 degrees Celsius.
Turbidity

2.9         A portable and weatherproof instrument with a DC power source was adopted. Its photoelectric sensor is capable of measuring turbidity between 0 and 1000 NTU.

Water Sampler

2.10     A small sampler with an extendable rod was used for water sampling due to the shallow water (water depth < 50cm) during the dry season at the monitoring stations. In all cases, the sampler had been submerged in the mid-water column before collecting water samples.

Water Depth Detector

2.11     Due to the shallow water (water depth < 50cm) at the monitoring stations, stainless steel rulers were proposed to determine the water depth.

Salinity

2.12     A portable salinometer capable of measuring salinity in the range 0 – 40 parts per thousand (ppt) was adopted for measuring the salinity of the water at each designated monitoring station.

pH

2.13     Instrument consists of a potentiometer, a glass electrode, a reference electrode and a temperature-compensating device. The instrument provides measurement precision of 0.1 pH in a range of 0 to 14. Standard buffer solutions of at least pH 7 and pH 10 were used for checking the instrument before and after use.

Sample Containers and Storage

2.14     Water samples for SS and zinc were stored in high-density polythene bottles with no preservative added, packed in ice or ice-cold insulator (cooled to 4°C without being frozen) and delivered to the laboratory and analysed as soon as possible after collection. Sufficient volume of samples was collected to achieve the detection limits stated in Table 2.5.

2.15     Table 2.4 summarises the type of sampling bottles and preservation method for laboratory testing. All sampling bottles were labelled (waterproof) with the sample lot number and sampling location reference number to avoid mishandling.

Table 2.4    Types of Sampling Bottles and Preservation Methods

Parameters to be Tested

Preservation

Type of Sample Container

Total Suspended Solids (SS)

Refrigerate

1-litre high-density polythene bottle

 

Calibration of In-situ Instruments

2.16     All in-situ monitoring instruments checked, calibrated and certified by a laboratory accredited under HOKLAS or any other international accreditation scheme before use and subsequently re-calibrated at 3-monthly intervals throughout all stages of the water quality monitoring.  Responses of sensors and electrodes are checked with certified standard solutions before each use.  Wet bulb calibration for a DO meter is carried out before measurement at each monitoring location. They were certified by High Precision Chemical Testing Ltd. (HOKLAS Registration No.296).

2.17     Sufficient stocks of spare parts, i.e., spare cables and sensors, have been maintained for replacements when necessary. Backup monitoring equipment was also available so that monitoring can proceed uninterrupted even when some equipment is under maintenance, calibration, etc.

Monitoring Methodology and QA/QC Procedure

In-situ Measurement

2.18     A multi-parameter meter (YSI EXO-01) was used to measure Dissolved Oxygen (DO) concentration, DO saturation (DO %), pH, temperature and turbidity

2.19     At each monitoring location, two consecutive measurements were taken for water samples being collected on site. The probes were retrieved from the water after the first measurement and then redeployed for the second measurement. Where the difference in the value between the first and second readings of each set was more than 25% of the value of the first reading, the reading was discarded, and further readings were taken.

2.20     For SS, water samples from the middle layer were collected. Water samples of adequate volume specified by the laboratory were collected and stored in high-density polythene bottles provided by the laboratory. Water samples were packed in ice and cooled to 4°C (without being frozen), delivered to a HOKLAS-accredited laboratory, High Precision Chemical Testing Ltd. (HOKLAS Registration No.296), for laboratory analysis of water samples as soon as possible after collection.

Laboratory Analytical Methods

2.21     The testing of SS was conducted by High Precision Chemical Testing Ltd. (HOKLAS Registration No.296), and comprehensive quality assurance and control procedures were in place to ensure quality and consistency in results. The SS determination work starts within 24 hours after the collection of the water samples. The testing method and limit of reporting are provided in Table 2.5.

Table 2.5    Methods for Laboratory Analysis for Water Samples

Parameters

Proposed Method

Detection Limit

Suspended Solids (SS)

APHA 2540D (1)

1.0 mg/L(2)

Note:

(1) APHA American Public Health Association Standard Methods for the Examination of Water and Wastewater.

(2) If the lab result of SS concentration at the control station was less than 1.0 mg/L, 1.0 mg/L would be assumed as the SS concentration for calculating the action and limit levels based on the control station as a conservative approach.

 

QA/QC Procedure

2.22     All QA/QC results, including blank, spike recovery, number of duplicate samples per batch, etc., are reported in accordance with the requirements of HOKLAS or an international accredited scheme. detection limits and accuracy submitted to EPD for approval before the commencement of the monitoring programme.  EPD may also request the laboratory to carry out analysis of known standards provided by EPD for quality assurance.

2.23     Additional duplicate samples may be required by EPD for inter-laboratory calibration. Remaining samples after analysis are kept by the laboratory for 3 months in case repeat analysis is required.  If in-house or non-standard methods are proposed, details of the method verification may also require submission to EPD.  In any circumstance, the sample testing has comprehensive quality assurance and quality control programmes. The laboratory prepares to demonstrate the programmes to EPD or its representatives when requested.

Decontamination Procedures

2.24     Water sampling equipment used during the course of the monitoring programme was decontaminated by manual washing and rinsing with clean river water or bottled water after each sampling event.

Sampling Management and Supervision

2.25     Water samples were dispatched to the testing laboratory for analysis as soon as possible after the sampling. All samples were stored in a cool box and kept at less than 4ºC but without frozen. All water samples were handled under chain of custody protocols and relinquished to the laboratory representatives at locations specified by the laboratory.

2.26     QA/QC reports by the HOKLAS-accredited laboratory, High Precision Chemical Testing Ltd. (HOKLAS Registration No.296), are attached with the laboratory testing report in Appendix F.

Results and Observations

2.27     Calculated Action and Limit Levels for water quality are presented in Table 2.6 below.

Table 2.6    Calculated Action and Limit Levels of Water Quality Monitoring

Parameters

Unit

Action Level

Limit Level

DO (1)

mg/L

≤ 3.8 (3)(4)

≤ 3.7 (3)(4)

Turbidity (2)

NTU

≥ 17.2 (3)

or

120% of the upstream control station(s) at the same tide of the same day, whichever is higher

≥ 17.7 (3)

or

130% of the upstream control station(s) at the same tide of the same day, whichever is higher

SS (2)

mg/L

≥ 25.0 (3)

or

120% of the upstream control station(s) at the same tide of the same day, whichever is higher

≥ 26.0 (3)

or

130% of the upstream control station(s) at the same tide of the same day, whichever is higher

Note:

(1) For DO, non-compliance with the water quality limits occurs when the monitoring result is lower than the limits.

(2) For turbidity & SS, non-compliance with the water quality limits occurs when the monitoring result is higher than the limits.

(3) Average concentrations with duplicates have been adopted in the calculation.

(4) The calculated action/limit levels of DO are the same after correcting to the nearest 0.1mg/L.

 

2.28     The WQ impact monitoring for the last week has been rescheduled from 27 & 29 April to 28 & 30 April. Another water quality monitoring was conducted as scheduled in the reporting period. The detailed monitoring schedule is shown in Appendix C.

2.29     The weather information for the reporting period is summarised in Appendix D.

2.30     The in-situ monitoring results and graphical presentation are shown in Appendix E. The laboratory testing reports of suspended solids are also given in Appendix F.

2.31     One (1) Action Level and four (4) Limit Level exceedances were recorded for Dissolved Oxygen (DO) of water quality monitoring in the reporting period. All exceedances are considered as non-project related.

2.32     No Action Level and three (3) Limit Level exceedances were recorded for Turbidity (TUR) of water quality monitoring in the reporting period. All exceedances are considered as non-project related.

2.33     No Action Level exceedances were recorded for Suspended Solids (SS) of the water quality monitoring, while one (1) Limit Level exceedance was identified in SS in the reporting period. All exceedances are considered as non-project related.

2.34     Table 2.7 shows the number of exceedances recorded in all water quality monitoring in the reporting period. The summary of the exceedance records and the investigation report for the exceedances in the reporting period is shown in Appendix H.

Table 2.7    Number of Exceedances in Water Quality Monitoring in Reporting Period

Parameters

No. of Exceedance

No. of Exceedances due to site activities of the Project

Action Level

Limit Level

Action Level

Limit Level

DO, mg/L

1

4

0

0

Turbidity, NTU

0

3

0

0

SS, mg/L

0

1

0

0

Total

1

8

0

0

 

2.35     Site audits were carried out weekly to monitor and audit the timely implementation of water quality within the site boundaries of the Project.  The summary of site audits is shown in Tables 6.1 and 6.2 of this report.

2.36     According to our field observations, the major influencing factors on the water quality monitoring results are summarised in Table 2.8.

Table 2.8    Major Influencing Factors on Water Quality Monitoring Results

Monitoring Stations

Influencing Factors on Water Quality Monitoring

C1 - Control Station

l General refuse accumulation surrounding the stream
l Suspected abnormal discharges surrounding the CEDD construction site
l Upstream muddy water from the sub-channel due to heavy rainfall weather

M1 - Impact Station

 


 

2               AIR Quality

Monitoring Requirements

3.1         According to the approved EM&A Manual for HSKEPP of the Project, 1-hour Total Suspended Particulates (TSP) monitoring was conducted to monitor the air quality for this Project. The sampling frequency of 1-hour TSP monitoring, at least three times in every six days, shall be undertaken when the highest dust impact occurs. Appendix A shows the established Action/Limit Levels for the environmental monitoring works.

Monitoring Locations

3.2         Three (3) designated monitoring stations were selected for the air quality monitoring programme. Table 3.1 describes the air quality monitoring locations, which are also depicted in Figure 3.1.

Table 3.1         Locations for Air Quality Monitoring

Monitoring Stations

Locations

Location of Measurement

AM1

Tseung Kong Wai

Ground Level

AM2

Farm House

Ground Level

AM3 (1)

Planned Port Back-up, Storage and Workshop

N/A

Note:

(1)    Air quality impact monitoring station AM3 has been suspended since Nov 2024.

 

3.3         According to the previous ET’s monitoring team, AM3 was blocked on 1 Nov 2024 for its construction works of the Port Back-up, Storage and Workshop use. Based on the communications among ET, DSD, IEC and EPD, all parties have no comment on the suspension of air quality impact monitoring at AM3 until the construction works at AM3 are completed. Details can be referred to Appendix L of the Monthly EM&A Report for Nov 2024.

Monitoring Parameters and Frequency

3.4         Table 3.2 summarises the monitoring parameters, monitoring period and frequencies of impact air quality monitoring. The monitoring schedule is shown in Appendix C.

Table 3.2         Impact Dust Monitoring Parameters, Frequency and Duration

Monitoring Stations

Parameter

Period

Frequency

AM1, AM2 & AM3(1)

1-hour TSP

0700 – 1900

Three times / six days

Note:

(1)    Air quality impact monitoring station AM3 has been suspended since Nov 2024.

 

Monitoring Equipment

3.5         The 1-hour sampling was determined by HVS to check the validity and accuracy of the results measured by the direct reading method.

3.6         Table 3.3 summarises the equipment to be used for air quality monitoring.  Copies of calibration certificates are attached in Appendix B.

Table 3.3         Air Quality Monitoring Equipment

Equipment

Model and Make

Serial No.

Quantity

1-hour TSP Dust Meter

Sibata Model No.: LD-5R

4X7585

4X7586

2

HVS for Calibration/Maintenance

GMW GS2310

10379

1

Calibrator

TISCH Model: TE-5025A

3864

1

 

Monitoring Methodology and QA/QC Procedure

1-hour TSP Monitoring
Measuring Procedures

3.7         The measuring procedures of the 1-hour dust meters were in accordance with the Manufacturer’s Instruction Manual as follows: (Sibata Model No.: LD-5R)

l   The 1-hour dust meter is placed at least 1.3 meters above ground.
l   Set POWER to “ON” and make sure that the battery level is not flashing or at a low level.
l   Allow the instrument to stand for about 3 minutes, and then the cap of the air sampling inlet has been released.
l   Push the knob to the MEASURE position.
l   Set time/mode setting to [BG] by pushing the time setting switch. Then, start the background measurement by pushing the start/stop switch once.  It will take 6 sec. to complete the background measurement.
l   Push the time setting switch to change the time setting display to [MANUAL] at the bottom left of the liquid crystal display.  
l   Finally, push the start/stop switch to stop the measuring after 1 hour of sampling.
l   Information such as sampling date, time, count value and site condition was recorded during the monitoring period.
Maintenance/Calibration

3.8         The following maintenance/calibration was required for the direct dust meters:

l   Check and calibrate the meter by HVS to check the validity and accuracy of the results measured by the direct reading method at 2-month intervals throughout all stages of the air quality monitoring.

3.9         Adoption of the wind data from the existing automatic wind station, i.e. Lau Fau Shan, operated by Hong Kong Observatory (HKO), rather than setting up wind data monitoring equipment, is based on the following justifications:

l   The Lau Fau Shan automatic wind station is located in the vicinity of the designated monitoring locations. This Automatic wind station (22°28'08", 113°59'01") is located at the north of the Project, and the anemometer is set up at 31m above mean sea level. It is clear of obstructions or turbulence caused by the buildings.
l   This automatic wind station was considered as the closest wind station to the Project that could provide representative wind data in the Hung Shui Kiu area; and
l   Wind data collected by HKO was considered as a reliable data source for the wind data; it is widely used in many EM&A Projects (e.g. Expansion of Hong Kong International Airport into a Three-runway System, Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works – Advance Construction Works). The dataset is more accurate and reliable, which can be downloaded periodically with a real-time data logger.

3.10     The data collected from Lau Fau Shan were used to check the wind speed and wind direction. This weather information for the reporting month is summarised in Appendix D.

Results and Observations

3.11     All 1-hour TSP monitoring was conducted at the operating monitoring stations as scheduled in the reporting period. The monitoring schedule is shown in Appendix C

3.12     The weather information for the reporting period is summarised in Appendix D.

3.13     The monitoring data and graphical presentations of 1-hour TSP monitoring results are shown in Appendix G.

3.14     No Action and Limit Level exceedance of the 1-hour TSP monitoring was recorded in the reporting period.

3.15     No exceedance was recorded for the air quality monitoring. The summary of the exceedance record in the reporting period is shown in Appendix H.

3.16     Site audits were carried out weekly to monitor and audit the timely implementation of air quality mitigation measures within the site boundaries of the Project.  The summary of site audits is shown in Tables 6.1 and 6.2 of this report.

3.17     According to our field observations, the major influencing factors on the air quality monitoring results are summarised in Table 3.4.

Table 3.4    Major Influencing Factors on Air Quality Monitoring Results

Monitoring Stations

Influencing Factors on Air Quality Monitoring

AM1 - Tseung Kong Wai

l Road Traffic at Ha Tsuen Road & the surrounding vintage road
l Non-project related construction activities and storage of dusty material from the CEDD project site managed by Gammon – Richwell Engineering Joint Venture

AM2 - Farm House

l Road Traffic at Ha Tsuen Road & the surrounding vintage road
l Non-project related construction activities from the CEDD project site managed by Sang HingKuly Joint Venture & Gammon – Richwell Engineering Joint Venture

AM3 - Planned Port Back-up, Storage and Workshop (1)

l N/A

Note:

(1) Air quality impact monitoring station AM3 has been suspended since Nov 2024.

 

Comparison of EM&A Result with EIA Prediction

3.18     The air monitoring data were compared with the predictions in the EIA Report (as approved in 2013), as summarised in Table 3.5.

Table 3.5    Comparison of 1-hr TSP Monitoring Data with Predictions in EIA Report

Monitoring Stations

ASR ID

Predicted Maximum 1-hr TSP Concentration in EIA Report (AEIAR-240/2022), μg/m3

Reporting Month Result,

μg/m3

AM1 - Tseung Kong Wai

A601

154.0

23.497.2

AM2 - Farm House

A602

215.1

8.088.0

AM3 - Planned Port Back-up, Storage and Workshop (1)

P1501

234.6

N/A

Note:

(1)    Air quality impact monitoring station AM3 has been suspended since Nov 2024.

 

3.19     The maximum 1-hour TSP concentration at AM1 & AM2 in the reporting month was lower than the prediction in the EIA Report (AEIAR-240/2022).


 

3               Waste Management

Monitoring Requirements

4.1         Waste generated from this Project includes inert construction and demolition (C&D) materials and non-inert C&D materials. Inert C&D waste includes soil, broken rock, broken concrete and building debris, while non-inert C&D materials are made up of C&D waste which cannot be reused or recycled and has to be disposed of at the designated landfill sites.

Results and Observations

4.2         The quantities of different types of waste generated by Contract DC/2024/11 and Contract DE/2024/09 in the reporting period are summarised in Tables 4.1 and 4.2, respectively. Details of the amount of waste generated by the major site activities of the Project during the reporting period are shown in Appendix L.

Table 4.1         Quantities of Waste Generated from Contract DC/2024/11

Contract DC/2024/11

Quantity

Inert C&D Materials

Non-inert C&D Materials

Reporting Period

Total Quantity

Generated

(in '000kg)

Disposed as

Public Fill (in '000kg)

Others, e.g.

general refuse (in '000kg)

Metals

(in '000kg)

Paper/cardboard

Packaging

(in '000kg)

Plastics

(in '000kg)

Chemical waste (in '000kg)

Apr 2026

14.39

14.39

13.78

0

0

0

0

 

Table 4.2         Quantities of Waste Generated from Contract DE/2024/09

Contract DE/2024/09

Quantity

Inert C&D Materials

Non-inert C&D Materials

Reporting Period

Total Quantity

Generated

(in '000kg)

Disposed as

Public Fill (in '000kg)

Others, e.g.

general refuse (in '000kg)

Metals

(in '000kg)

Paper/cardboard

Packaging

(in '000kg)

Plastics

(in '000kg)

Chemical waste (in '000kg)

Apr 2026

 

0

 

0

3.190

0

0

0

0

 

4.3         Site audits were carried out weekly to monitor and audit to ensure that proper storage, transportation, and disposal practices of waste materials generated during construction activities, such as construction and demolition (C&D) materials and general refuse, are being implemented. The summary of site audits is shown in Tables 6.1 and 6.2 of this report. The implementation status of the waste/chemical management measures in the reporting period is summarised in Appendix I.


 

4               landscape and visual

Monitoring Requirements

5.1         According to the EM&A Manual, site audits would be undertaken during the construction phase of the Project to check that the proposed landscape and visual mitigation measures are properly implemented and maintained as per their intended objectives. Site inspections of the implementation of landscape and visual mitigation measures would be undertaken regularly during the construction period.

5.2         Site inspection of the implementation of landscape and visual mitigation measures was undertaken by the ET at least once every month during the construction period.

Results and Observations

5.3         Site inspection of the implementation of landscape and visual mitigation measures within the site boundaries of this Project was conducted on 10 April 2026. The implementation status of the landscape and visual mitigation measures in the reporting period is summarised in Appendix I. The summary of observations and recommendations made for landscape and visual mitigation measures during site audits is shown in Tables 6.1 and 6.2 of this report.

5.4         No non-compliance with the landscape and visual impact was recorded in the reporting period.


 

5               Environmental Audit

Site Audits

6.1         Site audits were carried out on a weekly basis to monitor the timely implementation of proper environmental management practices and mitigation measures on the Project site. 

6.2         Site audits for the Project were conducted on 2, 10, 17, 24 & 30 April 2026 in the reporting period.  Joint site inspection with the representative of IEC was conducted on 10 April 2026. No non-compliance was observed during the site audit.

Review of Environmental Monitoring Procedures

6.3         The monitoring work conducted by the monitoring team was inspected regularly. The following procedures have been recorded for the monitoring works:

Water Quality Monitoring
l   The Water Quality Monitoring was conducted as scheduled in the reporting month.
l   The monitoring team recorded all observations surrounding the monitoring stations C1 & M1, which might affect the monitoring result.
l   The monitoring team confirmed the pH meter, DO meter and turbidimeter were checked and calibrated.
l   The monitoring team recorded the temperature, time, water depth and weather conditions during the sampling processes.
l   The Environmental Team followed the Event and Action Plan after the exceedance was recorded.
Air Quality Monitoring
l   The Air Quality Monitoring was conducted as scheduled in the reporting month
l   The monitoring team recorded all observations around the monitoring stations within and outside the construction site.
l   The monitoring team recorded the temperature, time and weather conditions on the monitoring days.

Implementation Status of Environmental Mitigation Measures

6.4         According to the Environmental Permit, the approved EIA Report (Register No.: AEIAR-240/2022), and the EM&A Manual of the Project, the mitigation measures detailed in the documents are recommended to be implemented during the construction phase.  An Environmental Mitigation Implementation Schedule (EMIS) is provided in Appendix I.

6.5         The ET weekly site inspections were carried out during the reporting period, and the observations, reminders, and follow-up actions for Contract DC/2024/11 and Contract DE/2024/09 are summarised in Table 6.1 and Table 6.2, respectively.


 

Table 6.1         Observations and Recommendations of Site Audit under Contract DC/2024/11

Parameters

Date

Observations

Follow-up Actions

Water Quality

24 Apr 2026

Vehicle wheel washing should be provided to prevent mud from flowing out of

the site at the Eastern site.

A dedicated vehicle wheel washing station has been installed at the site exit. The facility includes water spray nozzles, drainage channels, and bunding to contain and manage runoff water effectively. Temporary bunds have been constructed around the washing area to prevent contaminated water from flowing off-f-site.

Air Quality

N/A

No environmental deficiency was identified in the reporting period.

N/A

Noise

N/A

No environmental deficiency was identified in the reporting period.

N/A

Waste / Chemical Management

N/A

No environmental deficiency was identified in the reporting period.

N/A

Land Contamination

N/A

No environmental deficiency was identified in the reporting period.

N/A

Landscape and Visual

N/A

No environmental deficiency was identified in the reporting period.

N/A

Permits /Licences

N/A

No environmental deficiency was identified in the reporting period.

N/A

 

Table 6.2         Observations and Recommendations of Site Audit under Contract DE/2024/09

Parameters

Date

Observations

Follow-up Actions

Water Quality

N/A

No environmental deficiency was identified in the reporting period.

N/A

Air Quality

N/A

No environmental deficiency was identified in the reporting period.

N/A

Noise

N/A

No environmental deficiency was identified in the reporting period.

N/A

Waste / Chemical Management

N/A

No environmental deficiency was identified in the reporting period.

N/A

Land Contamination

N/A

No environmental deficiency was identified in the reporting period.

N/A

Landscape and Visual

N/A

No environmental deficiency was identified in the reporting period.

N/A

Permits /Licences

N/A

No environmental deficiency was identified in the reporting period.

N/A

 

Implementation Status of Event and Action Plans

6.6         The Event Action Plans for water quality and air quality are presented in Appendix J.

Water Quality Monitoring

6.7         One (1) Action Level and eight (8) Limit Level exceedances for water quality monitoring were recorded in the reporting period. All exceedances are considered as non-project related.

Air Quality Monitoring

6.8         No Action Level and Limit Level exceedances for air quality monitoring were recorded in the reporting period.

Summary of Complaint, Warning, Notification of any Summons and Successful Prosecution

6.9         No environmental complaints and environmental warnings, notifications of summons and successful prosecutions were received in the reporting period.

6.10     The summary of environmental complaint, warning, summons and notification of successful prosecution for the Project is presented in Appendix K.


 

6               future Key issues

7.1         Tentative construction programmes for the next three months are provided in Appendix O. The key site activities will be anticipated in the coming three months are shown in Table 7.1.

Table 7.1         Tentative Site Activities in the Next Three Months

Contract No.

Contract Title

Site Activities

DC/2024/11

Hung Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – Civil Works

l  Temporary Drainage Construction
l  Mobilisation work
l  Erection of the site office
l  Driven H-piling
l  Sheet piling

DE/2024/09

Hung Shui Kiu Effluent Polishing Plant (HSKEPP) Phase 1 – E&M Works and Biological Treatment Building

l   Erection of the site office
l   Ground investigation works at BTB for stage 2 of early access

 

7.2         Key environmental issues in the coming three months include:

l   Wastewater and run-off generation on-site;
l   Water spraying for dust-generating activities and on haul road;
l   Accumulation of general refuse and construction waste on-site;
l   Accumulation of a stockpile of soil & weeds from haul road cleaning activities or slope maintenance.

 

Recommendations

7.3         According to the environmental audit in the reporting month (April 2026) as well as the previous months, the following recommendations were made which shall be implemented in the next reporting month (May 2026).

Water Quality
l   The site practices outlined in ProPECC PN 2/24 “Construction Site Drainage” should be followed as far as practicable to minimise surface run-off and the chance of erosion.
l   All vehicles and plants should be cleaned before they leave a construction site to minimise the deposition of earth, mud and debris on roads.

 

Air Quality
l   Establishment and use of vehicle wheel and body washing facilities at the exit points of the site.
l   Open stockpiles shall be avoided or covered. Where possible, prevent placing dusty material storage piles near ASRs.

 

Monitoring Schedule for Next Month

7.4         The tentative environmental monitoring schedules for next month are shown in Appendix C.


 

7               Conclusions

8.1         This is the 20th Monthly EM&A Report, which presents the EM&A works undertaken during the reporting month from 1 April 2026 to 30 April 2026 in accordance with the EM&A Manual and the requirements under the EP-606.2022/A.

Water Quality Monitoring

8.2         The WQ impact monitoring for the last week has been rescheduled from 27 & 29 April to 28  & 30 April. Another water quality monitoring was conducted as scheduled in the reporting period.

8.3         One (1) Action Level and four (4) Limit Level exceedances for Dissolved Oxygen (DO) were recorded. All exceedances are considered as non-project related.

8.4         No Action Level and three (3) Limit Level exceedances for Turbidity (TUR) were recorded. All exceedances are considered as non-project related.

8.5         No Action Level exceedances were recorded for Suspended Solids (SS) of the water quality monitoring, while one (1) Limit Level exceedance was identified in SS in the reporting period. All exceedances are considered as non-project related.

Air Quality Monitoring

8.6         All air quality monitoring was conducted as scheduled in the reporting period.

8.7         No Action/Limit Level exceedance for 1-hour TSP monitoring was recorded.

Site Audit  

8.8         5 ET joint weekly environmental site inspections were conducted in the reporting period. Joint weekly site inspections with the representative of ET, the Engineer Representative and the Contractor for Contract No. DC/2024/11 and Contract No. DE/2024/09 were conducted on 2, 10, 17, 24 & 30 April 2026, whereas a monthly joint site inspection with the representative of IEC was conducted on 10 April 2026. All environmental deficiencies observed during site inspections were rectified by the Contractor.

Complaint, Notification of Summons and Successful Prosecution

8.9         No environmental complaints and notifications of summons and successful prosecutions were received in the reporting period.